Installation - Miele PRI 210 Operating Instructions Manual

Commercial flatwork ironer
Table of Contents

Advertisement

Installation

The flatwork ironer should be transported to the installation site using
a forklift. Do not remove the packaging until right before
commissioning.
This ironer must be transported or lifted from the wooden frame
only with the lateral mounting flaps fitted.
Lift the machine off its wooden frame at the installation site. Firstly
remove the clamps from the supporting feet. The clamps can be used
after installation for securing the flatwork ironer to the floor (see "Floor
anchoring").
The suspension points for lifting hooks/straps are located under the
side columns between the screw-on feet.
During installation, ensure that the clearance next to and behind the
machine columns amounts to at least 600 mm so that the side
cladding remains accessible.
The flatwork ironer should be set up so that the light shines onto the
infeed table as parallel as possible.
The clearance in front of the ironer must amount to at least 1.5 m to
prevent foreign materials (furniture, walls) from getting hot. There
should be a clearance of at least 1 m above the machine.
A base and anchoring means are not necessary.
During transportation of the machine, pay attention to its stability.
The ironer may not be transported without the wooden frame (e.g.
if it needs to be moved to a new location). If it needs to be moved,
lift it onto the wooden frame and secure it in position.
Installation and planning notes
23