Huawei LUNA2000-2.0MWH Series User Manual page 126

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:
Table of Contents

Advertisement

LUNA2000-2.0MWH Series Smart String ESS
User Manual
----End
Scenario 2
This procedure applies only to the models listed in the table below.
Models
LUNA2000-2.0MWH-1HX
LUNA2000-2.0MWH-2HX
LUNA2000-2.0MWH-2HX
Issue 08 (2022-11-15)
Figure 5-4 Routing the ground cables in from the top
If cables are routed in from the bottom of the socket, connect one end of the
cables (1762) to the ground points of the socket and the other end to the
reserved ground points on the rear panel.
Figure 5-5 Routing the ground cables in from the bottom
NO TE
● Cables 1755, 1758, 2066, 2065, 1761, and 1766 are pre-installed. Cables 1756, 1751,
1759, 1752, 1757, 1763, 1760, 1765, 1762, and 1764 need to be installed.
● The cables to be installed can be obtained from the cable binding position shown in the
figure before installing the socket.
Copyright © Huawei Technologies Co., Ltd.
Air Conditioner Position in the
Battery Cabin
1/2/4/5/7/8/10/11
1/3/5/7/9/11
2/4/6/8/10/12
5 Installing Cables
116