Huawei LUNA2000-2.0MWH Series User Manual page 139

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:
Table of Contents

Advertisement

LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 5-24 Connecting the five-core AC input power cable (including the ground
cable and the neutral wire)
(1) Screw assembly
(4) Wiring terminals
Step 4 Install the removed cover.
----End
Issue 08 (2022-11-15)
(2) Spring washer
(5) Copper bar
Copyright © Huawei Technologies Co., Ltd.
5 Installing Cables
(3) Large washer (optional)
(6) Flat washer
129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents