Network Management Card (Optional); Installing A Serial Network Management Card (Optional); Monitoring Software - ABB 8408608 User Manual

Table of Contents

Advertisement

32
A B B U P S P R O D U C T S A N D S O L U T I O N S

5 .4 Network management card (optional)

The PowerValue 11 RT G2 6–10 kVA is equipped
with an intelligent slot for optional cards for
remote management of the UPS through
the Internet/intranet. Either of the following
accessories can be installed in the intelligent slot:
• SNMP/Modbus Card – SNMP/Modbus, HTTP
and monitoring capabilities through a Web
browser interface.
• AS400 Card – AS400 card for AS400
communication protocol.
5 .4 .1
card (optional)
Each UPS has a communication slot for an
optional serial network management protocol
(SNMP/Modbus) card. After installing an SNMP/
Modbus card, an environmental monitoring probe
can be connected.
NOTE
Installing a serial network management
THE UPS DOES NOT HAVE TO BE SHUT
DOWN BEFORE INSTALLING A
COMMUNICATION CARD.
To install a network management card:
1. Remove the two screws that protect
the communication slot of the UPS.
2. Insert the SNMP/Modbus card into
the communication slot.
3. Screw the SNMP/Modbus card onto the slot
using the screws removed in Step 1
Compatible SNMP/Modbus cards: CS141 Basic,
CS141 ModBus, CS141 Advanced, Winpower SNMP,
Winpower ModBus.
For more information on the SNMP/Modbus
Cards, see the SNMP/Modbus user's manual.
For more details about parameters available
when using an SNMP/Modbus card with
PowerValue 11 RT G2, see Appendices A and B.
5 .4 .2

Monitoring software

The UPS can be monitored using software.
The software provides a remote and safe
shutdown for multi-client systems in case of
absence of power at the UPS output. Instructions
on how to install the software are provided with
the network management cards.
For more information, contact your local supplier.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervalue 11 rt g2840860784086198408609

Table of Contents