Angle Requirements; Preparing Tools - Huawei LUNA2000-100KTL-M1 User Manual

Smart power control system
Hide thumbs Also See for LUNA2000-100KTL-M1:
Table of Contents

Advertisement

LUNA2000-100KTL-M1 Smart Power Control System
User Manual

4.1.2 Angle Requirements

Figure 4-1 Installation angle

4.2 Preparing Tools

Before installation, the following tools need to be prepared.
Issue 07 (2023-07-15)
NO TE
● Class C environment: Outdoor areas more than 500 m away from the sea. If a site
is near a pollution source, it is 1500–3000 m away from heavy pollution sources,
such as smelteries, coal mines, and thermal power plants; 1000–2000 m away from
medium pollution sources such as chemical factories, rubber plants, and
electroplating factories; or 500–1000 m away from light pollution sources, such as
packing houses, tanneries, boiler rooms, slaughterhouses, landfill sites, and sewage
treatment plants.
● Class D environment: Sea environments or outdoor areas within 500 m away from
the sea. If a site is near a pollution source, it is within 1500 m away from heavy
pollution sources such as smelteries, coal mines, and thermal power plants; within
1000 m away from medium pollution sources such as chemical factories, rubber
plants, and electroplating factories; or within 500 m away from light pollution
sources such as packing houses, tanneries, boiler rooms, slaughterhouses, landfill
sites, and sewage treatment plants.
● Class E environment: Special environments, such as underground or underwater
environments.
Copyright © Huawei Technologies Co., Ltd.
4 Installing the Smart PCS
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionsolar luna2000-100ktl-m1Fusionsolar luna2000-200kwh-2h1

Table of Contents