Angle Requirements; Preparing Tools - Huawei LUNA2000-200KTL-H1 User Manual

Smart power control system
Table of Contents

Advertisement

LUNA2000-200KTL-H1 Smart Power Control System
User Manual

4.2.4 Angle Requirements

Figure 4-6 Installation angle

4.3 Preparing Tools

Before installation, the following tools need to be prepared.
Installation Tools
Hammer drill
Issue 08 (2024-01-23)
Drill bit (Ф14 mm
and Ф16 mm)
Copyright © Huawei Technologies Co., Ltd.
Insulated torque
socket wrench
(including an
extension bar ≥ 50
mm)
4 Installation
Phillips insulated
torque screwdriver
32

Advertisement

Table of Contents
loading

Table of Contents