Check the items listed in the following table. In case of any nonconforming items,
rectify the fault and reinstall the parts. Then check the items in the table again
until all they all pass the check.
Table 6-1 Item
Check Item
Installation
checks
Electrical
connection
checks
Other check
items
Issue 08 (2024-01-23)
6

Checking Before Power-On

Expected Result
The Smart PCS is not deformed or damaged.
The Smart PCS is properly installed.
The clearance around the Smart PCS meets requirements.
The external switches on the AC and DC sides are in the OFF
position.
All cables are intact and free from any damage or cracks.
All ground cables are connected securely and reliably.
All AC power cables are connected correctly and securely, and
no open circuits or short circuits occur.
All DC cables are connected securely in correct polarity, and no
open circuits or short circuits occur.
The communications cables are connected correctly and
securely.
The crimping module is securely installed.
The AC maintenance compartment is clean and tidy.
The DC maintenance compartment is clean and tidy.
The AC maintenance compartment door is closed and the
screws on the door are tightened.
The DC maintenance compartment door is closed and the
screws on the door are tightened.