Site Preparation - ABB InCharge Terra AL2-40-240-T1-WC1R Installation Manual

Terra ac wallbox 40a / 48a / 80a level 2 charger
Table of Contents

Advertisement

18
TA B L E O F C O N T E N T S

Site preparation

Select the site
1. Find a suitable site on a wall. For the specifications
of the wall, refer to
Table 13: Requirements for the wall
on this page.
2. Make sure that the correct power supply is available.
For the power supply specifications, refer to chapter
Technical data, page 32.
3. Obey the space requirements. Refer to
requirements for installation
Prepare the site
Table 11: Preliminary requirements
The site must be suitable to install the EVSE
Procedure
1. Make sure that the space and the airflow around the EVSE
are sufficient. Refer to
Table 12: Space requirements for
installation
on this page.
2. Make sure that the correct cables are available at the site:
• AC input cable. Refer to chapter
• RS485 cable. Refer to chapter
• Ethernet cable. Refer to chapter
Table 13: Requirements for the wall
Parameter
Wall thickness
Wall strength
Wall material
P R E V I O U S C H A P T E R
Table 12: Space
on this page.
Technical data, page 32
Technical data, page 32
Technical data, page 32
Specifications
Minimum 4.72 in (120 mm)
The wall must be serviceable for the items listed below:
1. The weight of the EVSE. Refer to chapter
2. The torque for the mounting screws. Refer to chapter
The mounting surface must be flat and stable, for example a finished, brick or concrete wall
N E X T C H A P T E R
Table 12: Space requirements for installation
Specification
Parameter
[in]
Z1
> 8
Z2 (indoor use)
18 to 48
Z2 (outdoor use)
24 to 48
Technical data, page 32
Technical data, page 32
[mm]
> 200
450 to 1200
600 to 1200
EVSE