9100C Planned Maintenance; Every Twelve (12) Months - GE 9100c Technical Reference Manual

Anesthesia machine
Table of Contents

Advertisement

9100c

6.2 9100c Planned Maintenance

Serial Number:
Hospital:
12 months
24 months
6.2.1 Every twelve
(12) months
Parts Replacement
Machine Checks and
Tests
6-4
M1207027
Reproduced from the electronic master in MATRIX
Date: (YY/MM/DD)
Performed by:
_______________
This section covers the regular maintenance procedures (minimum
requirements) needed to make sure that the 9100c anesthesia
machine — including the ventilator — operates to specifications.
Perform the following steps every 12 months.
For details, refer to the sections listed.
Replace the vaporizer port o-rings (Section 9.10).
Refer to the 9100c User's Reference Manual.
Perform the following steps:
1. User maintenance listed below. Including disassembly,
inspection, cleaning and parts replacement as required.
Breathing Circuit Maintenance (Section 7.5)
Bellows Assembly Maintenance (Section 9)
Bellows Assembly Tests (Section 9)
O
Sensor Calibration (Section 9)
2
Refer to listed sections in this manual.
Perform the following steps:
1. MOPV pressure relief valve test (Section 6.5).
2. Exhalation valve reilef valve test (Section 6.6).
3. From the Service Mode, perform the following:
Display Discrete I/O Signals (Section 4.4.1)
Verify proper operations of all circuit boards and switches.
Adjust Drive Gas Regulator (Section 6.4)
PAW Zero (Section 4.5.1)
PAW Gain (Section 4.5.2)
PEEP Valve (Section 4.5.4)
Flow Zero (Section 4.5.5)
Inspiratory Flow Valve (Section 4.5.6)
Flow Sensor Positive (Section 4.5.7)
Flow Sensor Negative (Section 4.5.8)
4. Inspect the system (Section 3.2)
5. Pipeline and cylinder tests (Section 3.3)
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English
M1207026

Advertisement

Table of Contents
loading

Table of Contents