Installing And Removing The Demolition Hammer; Installing The Hammer - Komatsu PC27R-8 Operation & Maintenance Manual

Hydraulic excavator
Hide thumbs Also See for PC27R-8:
Table of Contents

Advertisement

6.2.3 INSTALLING AND REMOVING THE DEMOLITION HAMMER

6.2.3.1

INSTALLING THE HAMMER

DANGER
The machine must be parked on a level surface, with the
equipment resting on the ground.
For the installation, the hammer must be positioned hori-
zontally, with the bit directed towards the machine.
When the coupling pins are removed or installed, chips
may come off; always wear gloves, safety goggles and
helmet.
The change of the equipment must be carried out by two
operators, who must decide together the words and sig-
nals to be used during operations.
Do not use your fingers to center the holes, since they
may be injured or even cut.
Release the residual pressure that may be present in the
pipes completely.
For the installation of the demolition hammer it is necessary to
connect the mechanical constraints of the bucket as described
in "3.13.4 CHANGING THE BUCKET" and to carry out the hy-
draulic connections using the pipes provided. After connecting
the mechanical constraints, carry out the hydraulic connections
by proceeding as follows:
1 - Stop the engine and move the hydraulic controls in all direc-
tions, in order to completely release the residual pressures
present in the circuits of the machine.
2 - Press the hammer control pedal to release the residual pres-
sure present in the hammer delivery pipe.
3 - Slowly loosen the hydraulic oil filling cap, in such a way as to
release the residual pressure from the tank.
4 - Remove the sealing plugs of the rapid couplings of both the
machine and the hammer.
5 - Connect the right (1) and left (2) pipes. The rapid couplings
must be in compliance with the ISO 7241-1 series "B" stand-
ard.
CAUTION
When connecting the pipes, take care to prevent any im-
purities from getting into them.
6 - Rotate the control of the selection valve (3) completely anti-
clockwise (Pos. A).
7 - Start the machine and raise the demolition hammer position-
ing it vertically.
ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
1
2
1/2" GAS
SX
DX
1/2" GAS
3
A
2
RWA07950
1
RWA07960
RWA10140
189

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc20r-8

Table of Contents