Removing The Hammer; Maintenance - Komatsu PC27R-8 Operation & Maintenance Manual

Hydraulic excavator
Hide thumbs Also See for PC27R-8:
Table of Contents

Advertisement

ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
8 - Stop the machine again and lubricate the joints (See "4.5 LUBRICATION") and the hammer (See the specific
use and maintenance manual).
9 - Before starting work, check the seals.
DANGER
Always wear thick gloves and safety goggles during this check.
To check the system for leaks, use a piece of cardboard or a wooden board.
6.2.3.2

REMOVING THE HAMMER

To remove the hammer, proceed as follows:
1 - Stop the engine and move the hydraulic controls in all directions, in order to completely release the residual
pressures present in the circuits of the machine.
2 - Press the hammer control pedal to release the residual pressure present in the hammer delivery pipe.
3 - Slowly loosen the hydraulic oil filling cap to release the residual pressure from the tank.
4 - Disconnect the hammer feeding and draining pipes.
5 - Fit the sealing plugs of the rapid couplings.
6 - Disconnect the hammer from the mechanical constraints, as described in "3.13.4 CHANGING THE BUCKET".

6.2.4 MAINTENANCE

The hydraulic system does not require any maintenance operation and inspection other than those prescribed for
the machine.
For the maintenance operations required for the hammer, see the specific operation manual.
190

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc20r-8

Table of Contents