Schedule] Menu - Fujitsu PRIMEQUEST 2000 Series Tool Reference

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

MMB Web-UI (Web User Interface) Operations
Message Number
E_00141
E_00142
E_00002
E_00144
E_00145
E_00146
E_00143
E_00091
E_00xxx
E_00154
I_00151
E_00xxx
E_00xxx
E_00xxx
W_00504
E_00xxx
For details on the messages displayed on the window, see
(C122-E178EN).

1.7.8 [Schedule] Menu

The [Schedule] menu has the [Schedule Control] and [Schedule List] windows. This section describes the
windows and the operation.
Note
As mentioned below, there may be a delay in the time recorded in SEL compared to the time reserved for
scheduled operations.
After checking the configuration and after performing the start up preparation process, it takes some
time until the power is ON. In this case, the SEL display is delayed about from six seconds up to 8
seconds than the time reserved for the scheduled operations.
The shutdown instructions from MMB to OPERATING SYSTEM take certain time from the set time.
However, the following interval times may be changed under the various conditions like setting and the
configuration.
Interval time until shutdown instructions reaches OS from MMB.
Interval time until MMB notifies SEL begin shutdown after OS begins shutdown.
Even if the [Power on Delay] is 0 seconds, it takes about 30 seconds ~ 70 seconds from starting the
power on up to the reset.
[Schedule Control] window
In the [Schedule Control] window, the setting related to the schedule can be set for system.
Unable to power on the System.
Unable to power off the System.
Command Failed
Unable to power off/on the System.
Unable to reset the System.
Unable to generate an NMI interrupt in the System.
Unable to forcibly power off the System.
Force Power Off Delay setting failed.
Unable to power on the system due to CPU mismatch between SBs.
Unable to power on due to mismatch between supply voltage and input voltage.
Unable to control system power because maintenance is in progress.
Release maintenance mode first.
Unable to power on the system due to CPU composition abnormal.
Unable to power on the system due to DIMM composition abnormal.
Unable to power on the system due to DIMM does not satisfy requirements of Mode.
The Power On failed, because of switching the Home SB.
Please execute it after a while again.
Unable to power on the system due to abnormal SB composition.
Message
PRIMEQUEST 2000 Series Message Reference

Advertisement

Table of Contents
loading

Table of Contents