Installation Space; Checking The Contents - Hitachi L-2100 Instruction Manual

Table of Contents

Advertisement

More than
750 mm
under ground
10 mm

2.3.2 Installation Space

2.4 Checking the Contents

Power outlet
Ground resistance:
Less than 100 ohms
300 mm
Ground
2 mm
For installation of this system, it is required to provide a space of
at least 640 mm (width) × 550 mm (depth). Prepare a sturdy,
level desk or bench capable of supporting a weight load of at
least 150 kg. On the rear of the main unit, allow at least
100 mm of clearance.
NOTICE: Installation of the instrument shall be carried out by
or under supervision of qualified service personnel
of the manufacturer or its authorized service agent.
Before installation of the instrument, the customer
is requested to prepare necessary utilities referring
to this manual.
When relocation of the instrument becomes
necessary after initial installation (delivery), please
notify your local Hitachi High-Technologies sales
representative or service office.
After unpacking, check the contents of each case against the
packing list attached to it.
2 - 5
Table tap with
ground cable
Ground
Power cord
terminal
Ground wire
(green)
2.3.2
L-2100/2130
Connector

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents