Utam, Inc - Toshiba Strata AirLink Installation Manual

Digital business telephone systems
Hide thumbs Also See for Strata AirLink:
Table of Contents

Advertisement

Appendix – Specifications

UTAM, Inc.

Do not install the wireless equipment on public coin service provided by the telephone company.
Connection to party line service is subject to state tariffs. Contact the state public utilities
commission for information.
It is recommended that an AC surge arrestor be installed in the AC outlet to which the wireless
system is connected. This prevents damage to the equipment caused by local lightning strikes and
other electrical surges.
The wireless system provides access to interstate providers of operator services through the use of
equal access codes. Modifications by aggregators to alter these capabilities is a violation of the
telephone operator consumer services improvement act of 1990 and Part 68 of the FCC Rules.
Part 15
This equipment has been tested and found to comply with the limits for a Class A digital device,
pursuant to Part 15 of the FCC Rules. These limits provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment.
This equipment generates, uses, and can radiate radio frequency energy. If not installed and used in
accordance with this chapter of the Strata DK Installation and Maintenance Manual, it can cause
harmful interference to radio communications.
Important!
Changes or modifications not expressly approved by Toshiba America Information
G
Systems, Inc. can void the authority to operate the equipment.
The 25-pair cable that connects the BSIA to an MDF must be shielded to meet FCC
G
emissions limits under Part 15 Class A.
UTAM, Inc.
The Strata AirLink system operates in the 1920~1930MHz band, and microwave services are also
offered in this band. The FCC has designated UTAM, Inc. to coordinate the transition of
microwave services to other frequency bands and the installation of new UPCS equipment, which
includes the wireless system, until all microwave users are cleared from the band.
Each device requesting FCC certification must have an affidavit from UTAM stating that the
device meets the requirements of Rules 15.307(d), (e), and (h), regarding UTAM location
verification and disablement. The basic mandatory requirements are:
o
The handset must not transmit when it is not within the coverage area of any system Base
Station.
o
A Base Station must not begin operation until it is UTAM confirmed and attached to a
permanent structure such as a building so that it cannot be easily relocated.
o
If the system is removed from its original installed location and re-installed at another
location, the system must not begin operation until the new location is UTAM confirmed.
The Frequency Coordination Service Request (sample on Page 101) must be completed and sent to
UTAM before activation of the system. Contact the Strata AirLink Desk at (949) 598-4980 for
more information between the hours of 8:00 a.m. and 5:00 p.m. (Pacific Standard Time), Monday
through Friday. Voice mail is available for messages after hours.
100
Strata AirLink Installation Guide
5/00

Advertisement

Table of Contents
loading

Table of Contents