Pre-installation

Step 4: Unpack Shipment

Cubicles, Walled Offices, and Conference Rooms

Although the number of Base Stations in
this environment would depend on the
number of handsets, the Base Stations are
aligned with corridors to maximize the line
of sight (see
Instead of placing both Base Stations close
to each other, place Base Station 1 near the
conference rooms and entrance area to
accommodate greater potential traffic in
these areas.
Step 4: Unpack Shipment
1. Inspect all packages carefully and note any visible damage when the system first arrives. If
any damage is found, do not open the packages. Contact the delivery carrier immediately and
make the proper claims.
2. Unpack all of the packages.
3. Be sure to retain the original packaging materials for re-use when storing or transporting the
system components.

Step 5: Check Equipment List

1. Before installation, check the system components against the packing list and inspect all
equipment for damage. If equipment is missing or damaged, contact the supplier immediately.
2. Ensure that the following Toshiba-supplied equipment was delivered:
o
BSIA or RWIU PCBs
o
PC cable with DB9 or DB25 adapter (BSIA)
o
RWIU Manager interface cable (6-pin connector)
o
Power supplies
o
Optional power supply for locally powered Base Stations
o
Base Stations, handsets, and Charger Bases
Strata AirLink Manager and RWIU Manager software (two floppy disks)
o
12
Figure
12).
Cubicle
Area
Base Station 2
Main
Entrance
Base Station 1
Figure 12
Office Area with Cubicles and Walls
Strata AirLink Installation Guide
Walled Offices
Cubicle
Area
2978