Step 4: Install RWIU/WWIS into Strata DK

1. Insert the RWIU (WWIS and components facing right) into the appropriate slot of the Strata
DK and apply firm, even pressure to ensure proper mating of connectors.
CAUTION!
Strata DK power must be off before inserting the RWIU.
2. After installing the RWIU, gently pull the PCB outward. If the connectors are properly seated,
a slight resistance is felt.

Step 5: Run Cable

1. Do not exceed these cabling distances between the Base Stations and WWIS for Category 5,
24 AWG:
o
2,000 feet for line power
o
3,300 feet for local power
2. Use Category 5 cable. Using a mix of Categories 2, 3, 4, and 5 is acceptable but can effect the
total possible cable length.
3. Connect one end of each cable into the RJ45 jacks
on the RWIU/WWIS (Point B in
the other end (reversed) into the EMI box (Point
A in
Figure
26). The RJ-45 transmit and receive
pins are shown in
4. Connect each end of the other set of cables into
the RJ-45 jacks of the EMI box (Point C - To Base
Stations in
Figure
out to the Base Stations.
WWIS1A (side)
RWIU1A (side)
Figure 26
EMI Connections to the RWIU/WWIS
Strata AirLink Installation Guide
Figure
26) and
Figure
25.
26) and run the opposite end
3724
5/00
Step 4: Install RWIU/WWIS into Strata DK
RJ45
Figure 25
RJ-45 Pin Configuration
C -
To Base Stations
B
A
RWIU System Installation
1 2
3
4
5
6
Transmit
Receive
RJ45
RJ45
RJ45
3512
EMI
47

Advertisement

Table of Contents
loading

Table of Contents