Shutting Down The Servers You Are Replacing - Hitachi 3080 G2 Hardware Reference Manual

Hitachi nas platform
Hide thumbs Also See for 3080 G2:
Table of Contents

Advertisement

Shutting down the servers you are replacing

On the servers that you are replacing:
Procedure
1.
2.
3.
118
• Admin IP address and name
• Cluster node IP address
The evs list command also displays these IP addresses.
From the server console, issue the command: cn node shutdown --
ship --powerdown
(where node represents the targeted node)
Wait until the console displays Information: Server has shut down,
and the rear panel LEDs turn off. The PSU and server fans continue to
run until you remove the power cables from the PSU module. See the
appropriate system component section for more information.
Note: This specific powerdown command prepares the system for both
shipping, and potential long-term, post-replacement storage.
Unplug the power cords from the power supplies.
Wait approximately 15 seconds, and then confirm the NVRAM status LED
is off.
If the LED is flashing or fixed, press and hold the reset button for five
seconds or until the LED starts flashing. The battery disables when you
release the reset button.
Server replacement procedures
Hitachi NAS Platform 3080/3090 G2 Hardware Reference Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3090 g2

Table of Contents