Server Replacement Procedures - Hitachi 3080 G2 Hardware Reference Manual

Hitachi nas platform
Hide thumbs Also See for 3080 G2:
Table of Contents

Advertisement

The replacement of the server as part of a field service process can take
several forms depending on how the system was originally deployed. The
typical field deployment scenarios documented for service replacement
include:
• Single stand-alone server using an embedded SMU for management
• Single stand-alone server using an external SMU for management
• Two-node cluster using an external SMU for management-replacing only
• Two-node cluster using an external SMU for management-replacing both
Important: This document does not treat migration scenarios between
different configurations at the time of replacement.
88

Server replacement procedures

one node
nodes
Replacement procedure overview
Replacing a single server with an embedded SMU
Replacing a single server with an external SMU
Replacing a node within a cluster
Replacing all servers within a cluster
Server replacement procedures
Hitachi NAS Platform 3080/3090 G2 Hardware Reference Guide
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3090 g2

Table of Contents