1
-
Three-pole male receptacle M 16
For the transmission of the alarm, a three-pole cable box M 16 can be connected at position (1) at the evaluation unit.
Plug-and-socket connectors are operating resources that, when properly used (under voltage), must
not be plugged-in or disconnected.
METPOINT
®
OCV
Operation
55