Start-Up - Beko METPOINT OCV Installation And Operation Manual

Oil vapour measuring device with sampling probe
Table of Contents

Advertisement

DANGER!
Missing separator!
All voltages representing a hazard when coming into contact with them must be disconnectable via assigned
separators that need to be installed externally.
The separator must be installed in the vicinity of the device.
The separator needs to correspond to IEC 60947-1 and IEC 60947-3.
The separator must separate all voltage-carrying conductors.
The separator must not be installed in the power supply line.
The separator must be easily accessible for the user.
Prior to establishing the connection with the electric mains, the housing of the evaluation unit with user
interface (display) and the sensor unit must be connected with the supplied signalling cable!

11 Start-up

NOTE!
Exceeding of the operating data!
Make sure that the operating parameters comply with the data indicated on the type plate and in the operating
instructions of the METPOINT
ambient temperature, etc.).
®
All METPOINT
OCV measuring devices are carefully tested and controlled prior to delivery. For this purpose, the
actual operating conditions are simulated. Apart from this, it can happen that the measuring device is damaged during
the transport. Therefore, we recommend you examine the specified function of the METPOINT
subsequent to delivery and during the first hours of operation.
The start-up must be carried out by qualified and authorised skilled persons.
It is vital that the technician carrying out the start-up uses safe tools and that he proceeds in accordance with
the local safety and accident prevention regulations. The technician is responsible for the proper and safe
operation of the METPOINT
are removed or open.
Please observe the following advice during the first start-up, each time after a longer downtime, or
subsequent to maintenance or calibration. The initial start-up or the re-start must only be carried out by
qualified and authorised skilled persons.
DANGER!
Supply voltage!
The connection to the electric mains and the corresponding protective equipment must comply with the legal
provisions in force at the place of installation of the METPOINT
be carried out by specialists who are qualified accordingly.
METPOINT
®
OCV
®
OCV (voltage, frequency, air pressure, pressure dew point, air temperature,
®
OCV. The METPOINT
®
OCV must not be started up while the housing covers
®
OCV; the connection and installation must
Start-up
®
OCV in detail
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents