Mitsubishi Electric GOT2000 Series User Manual page 245

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■4. Installation (GT16H-CNB-42S)
The Connector Conversion Box can be installed on the panel face directly or on the DIN rail.
(1) Mounting on the panel face (When setting the connector for Handy GOT connection and the
power supply switch on the panel surface)
Step 1.
Drill a mounting slot of the following size on the panel face.
Step 2.
Install the accessory packing to the packing attachment chase of the Connector Conversion Box.
Be sure to install the packing.
Step 3.
Fit the Connector Conversion Box from the back side of the panel face, and fix it with four M4 screws
(prepared by user).
In the Connector Conversion Box, thread of M4, 6 mm in depth is cut in each mounting hole.
Prepare four M4 mounting screws separately while considering the thickness of the panel face.
Tighten the mounting screw within the specified torque range (0.69 N•m to 0.88 N•m).
Tightening screws too much may cause damage.
Make sure that interfering objects are not located within 65 mm from the rear face so that the connector of
a PLC cable is not hindered.
To wire the terminal block, keep a space of 25 mm or more on both sides of the Connector Conversion
Box.
77±0.5 (3.04±0.02)
4-R3 (0.12)max
(Panel opening)
61+1,-0 (2.41±0.04 ,-0 )
(Panel opening)
Drill 4- 5±0.5 (0.2±0.02)
Panel cut area
Unit: mm (inch)
Elevation view
Packing attachment chase
Other device
ON
OFF
65 (2.56)
Other device
7.1 Connector Conversion Box
25 (0.99)
ES1A
ES1B
ES2A ES2B ES3A ES3B
FG
ES1A
ES1B
ES2A ES2B ES3A ES3B
-INPUT 24VDC+
ID No.
U
L
RS-232
RS-422
10BASE-T
SW-COM
SW2
SW4
SW6
KSW1 DSW1 DSW2
100BASE-TX
SW1
SW3
SW5
KSW-COM
KSW2
DSW1 DSW2
25 (0.99)
Unit: mm (inch)
7
7 - 5

Advertisement

Table of Contents
loading

Table of Contents