SmartLogger2000
User Manual
Figure 5-1 Connecting the power cable if the SmartLogger is installed outside a smart array
controller
Step 4 Switch on the circuit breaker of the AC socket.
Step 5 Switch on the upstream circuit breaker of the AC power cable.
Step 5
----End
(2016-06-20)
needs to be performed only in the PLC networking scenario.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 System Operation
71