NEC UNIVERGE SV8300 System Maintenance Manual page 102

Ip pbx
Hide thumbs Also See for UNIVERGE SV8300:
Table of Contents

Advertisement

BLADE
LED STATUS
NAME
CC-CP01
LINK LED is off
(CPU)
S2 LED is flash-
ing orange in a
special pattern,
ON: OFF=1: 9.
(This applies only
when the CPU is
operating as a
standby CPU.)
PZ-BS10
LED1 is not on
(BUS0)
LED2 is not on
LED3 is not on
PZ-BS11
LED1 is not on
(BUS1)
Remedial Action on Each LED Status
FAULT
CONTENT
LAN connection failure
Communication error
occurrence between the
active CPU and the
stand by CPU
Expansion Chassis 1
connection failure
Expansion Chassis 2
connection failure
Expansion Chassis 3
connection failure
Expansion Chassis 1
connection failure
2-34
Chapter 2 TROUBLESHOOTING
FAULT INFORMATION DISPLAY
REMEDIAL ACTION
Check to see if the LAN cable is
1
correctly connected.
Confirm the condition of the LAN
2
device (such as power of the HUB)
connected to the CPU blade.
If the fault cannot be cleared,
3
replace the blade.
Check to see if the LAN cable is
1
correctly connected.
If the fault cannot be cleared,
2
replace the blade.
Check to see if the BUS cable is
1
correctly connected.
If the fault cannot be cleared,
2
replace the blade.
Check to see if the BUS cable is
1
correctly connected.
If the fault cannot be cleared,
2
replace the blade.
Check to see if the BUS cable is
1
correctly connected.
If the fault cannot be cleared,
2
replace the blade.
Check to see if the BUS cable is
1
correctly connected.
If the fault cannot be cleared,
2
replace the blade.
Continued on next page
NWA-033627-001 Rev.4.0
95ch2001.fm
APRIL/16/2010

Advertisement

Table of Contents
loading

Table of Contents