Setting in the intelligent device station on CC-Link IE Field Network
Connect the engineering tool to the remote head module of the intelligent device station on CC-Link IE Field Network and set
the parameters.
1.
Set the remote head module as follows.
[Project] [New]
2.
Set the items in "Network Required Setting" of "CPU Parameter" as follows.
[Navigation window] [Parameter] [RJ72GF15-T2] [CPU Parameter] [Network Required Setting]
3.
Set the transfer setting between devices as follows.
[Navigation window] [Parameter] [RJ72GF15-T2] [CPU Parameter] [Network Application Setting] [Transfer
Setting between Devices]
4.
Set the master/local module as follows.
[Navigation window] [Parameter] [Module Information] Right click [Add New Module]
APPX
196
Appendix 9 When Connecting the Module to a Remote Head Module