GE LOGIQ E9 User Manual page 140

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

After the Exam is Over
Trophon EPR Instructions for Use
Installing the
disinfectant
cartridge
Disinfecting probe
in Trophon EPR
NOTE:
CAUTION
3-14
1. The cartridge door automatically opens when a cartridge
needs replacing.
2. Screen message: "Load Cartridge" or "Cartridge Empty,
Replace Cartridge Now" displays.
3. Wear disposable gloves and chemical resistant goggles.
These should be worn at all times while using the Trophon
EPR.
4. Press the soft key button under "Yes" to open the cartridge
replacement door.
5. Remove the cartridge lid and insert the bottle on the side of
the unit.
6. Rotate the cartridge until it drops into place and cannot
rotate any further.
7. Close the cartridge door. Do not use excessive force to
accomplish this. The door clicks into place and locks.
8. When the screen message reads "Load Probe", open the
chamber door.
9. Clean and rinse the probe. Dry the probe.
The probe must be cleaned, per the manufacturer's
guidelines, and dried before disinfection.
10. Place Chemical Indicator on the bottom of the device
chamber.
11. While holding the probe handle, press the top of the probe
into the chamber's seal. Ensure the probe is straight and not
touching either the walls or bottom of the chamber. Strain
relief (interface between cable and probe body) must be
positioned at the top of the chamber. The tip of the probe
must be above the horizontal line marked in the chamber.
Do NOT allow the probe surface or lens to touch the
chamber's wall during the disinfection process. This could
cause permanent damage to the probe.
LOGIQ E9
Direction 5454884-100 English Rev. 1
User Guide

Advertisement

Table of Contents
loading

Table of Contents