Siemens SINAMICS S120 Manual page 116

Cabinet modules
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical installation
4.6 Connections
Cable routing for DRIVE-CLiQ connections and signal cables
1. Feed the DRIVE-CLiQ/signal cable into the cabinet from the bottom left.
2. Use cable ties to secure the cable at suitable points.
3. Feed the cable up through the cabinet and, when it reaches the Control Unit, guide it up
4. Use cable ties to secure the cable at suitable points.
5. Connect DRIVE-CLiQ/signal cable to the Control Unit.
114
Frame size:
FB
GB
and to the right towards the Control Unit. When doing so, route the cable in a similar
manner to the standard cables that have already been installed in the cabinet.
GD
Cabinet Modules
Manual, 03/2013, A5E03263538A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents