Siemens SINAMICS S120 Manual page 134

Cabinet modules
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical installation
4.6 Connections
Cable routing for signal cables to SMC10/20/30 Sensor Module
1. Feed the cable for the customer terminal block into the cabinet from the bottom left.
2. Remove approx. 3 cm of the insulation at the level of the shield plate in the lower part of
3. To secure the cable in accordance with EMC requirements, snap the clip onto the shield
4. Use cable ties to secure the cable at suitable points.
5. Guide the cable further up into the cabinet and, when it reaches the SMC10/20/30 Sensor
6. Use cable ties to secure the cable at suitable points.
7. Connect the cable to the SMC10/20/30 Sensor Module (-B81/-B82/-B83).
132
Frame size:
FX+GX
HX+JX
the cabinet and attach the cable there.
plate.
Module (-B81/-B82/-B83), guide it to the right to the Sensor Module. When doing so,
route the cable in a similar manner to the standard cables that have already been
installed in the cabinet.
(→ See the chapter titled "Options", K46, K48 and K50 (Sensor Module Cabinet-Mounted
SMC 10, 20 and 30)
Cabinet Modules
Manual, 03/2013, A5E03263538A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents