5.2.3 Preparing Consumables

After connecting cables, seal the gaps between cables and cable inlet and outlet holes using
firestop putty. Huawei does not provide the firestop putty. The customer needs to purchase it.

5.2.4 Checking Personnel Requirements

Construction personnel must have basic knowledge of safe operation, be trained to master
correct operation methods, and have the appropriate job qualifications.
The owner should pay attention to the following items when organizing the construction
personnel to carry out construction work:

5.2.5 Checking the Installation Environment

Ensure that the installation environment meets the requirements listed in
Requirements

5.3 Installing the PDC

Prerequisites
Context
Issue 02 (2016-11-10)
Construction personnel have been trained and qualified by Huawei to master methods for
system installation and commissioning, and have obtained work permits before they
begin to install and commission equipment.
The number of construction personnel depends on the project progress and the
installation environment.
Construction personnel have read through the safety precautions and related product
documents before they begin work.
before installation.
Huawei will not be liable for any consequences caused if the installation environment does not meet the
requirements.
The installation environment has been checked with expected results.
The site has been closed off, and notices have been posted.
The PDC has been unpacked and inspected, and no problems were found.
You have obtained the tools and meters required for the installation.
Installation personnel must be qualified and certified. Power distribution equipment
operators must hold a primary electrician certificate or higher.
A modular precision PDC can be installed on a concrete floor or an ESD floor.
A modular precision PDC can be deployed separately or combined with another cabinet.
As the onsite conditions may vary, the following steps are for reference only. Onsite installation
personnel and technical engineers can decide whether to perform the steps based on the actual situation.