Huawei PDU8000 Series User Manual page 44

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000 Series:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual
Step 2 Mark the positions for installing expansion bolts.
Figure 5-2 W x D: 600 x 1200
Step 3 Use a hammer drill to drill holes to depths of 52 mm to 60 mm at the positions for installing
expansion bolts.
Step 4 Slightly tighten the expansion bolt and vertically insert it into the hole. Knock the expansion
bolt using a rubber mallet until the expansion sleeve is fully inserted into the hole.
Step 5 Partially tighten the expansion bolt.
Step 6 Remove the bolt, flat washer, and spring washer.
Figure 5-3 Installing expansion sleeves
(1) M12 bolt
(4) Expansion sleeve
Step 7 Align the PDC mounting holes with the expansion bolt holes.
Issue 02 (2016-11-10)
(2) Spring washer
(5) Concrete floor
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
(3) Flat washer
37

Advertisement

Table of Contents
loading

Table of Contents