5.3.3 Installing the PDC on an ESD Floor
Context
A support is required when the PDC is installed on an ESD floor. The support height depends
on the height between the ground and the ESD floor.
Procedure
Step 1 Lower the leveling feet of the PDC using an adjustable wrench until all castors are off the
ground and the cabinet is level.
Step 2 Lift the PDC onto the support and align the mounting holes on the PDC with those on the
support.
Step 3 Level the PDC by adjusting the leveling feet, as shown by (1) in
Step 4 Insert four M12 bolts into the mounting holes on the PDC and support. Partially tighten the
bolts, as shown by (2) in
Figure 5-8 Leveling and tightening bolts
(1) Leveling foot
Step 5 (Optional) Combine cabinets.
1.
2.
3.
4.
Issue 02 (2016-11-10)
Figure
Remove the front and rear doors of the PDC and level the PDC, as shown by (1) in
Figure
5-9.
Remove the cabinet connecting plates from the rack, as shown by (2) in
Secure the connecting plates in the connection positions on the front door using screws,
as shown by (3) in
Figure
Use the same method to secure the connecting plates in the connection positions on the
rear door.