6.2 Power-On Commissioning

Context
Procedure
Step 1 Switch on the SPD circuit breaker, as shown in
If the indicator of an SPD module is green, the SPD module is running properly. If an
indicator is red, the corresponding SPD module has failed and must be promptly replaced.
Issue 02 (2016-11-10)
Check Item
All bolts are tightened, especially the bolts used for
electrical connection. Flat washers and spring washers are
installed properly.
Cables are bundled neatly, and cable ties are secured
evenly and properly.
Cables are routed in the way convenient for future
maintenance and expansion.
There are no unnecessary adhesive tape or cable ties on the
cables.
Exposed parts near the wiring terminals and lugs are
wrapped in PVC insulation tape or heat shrinking tubing.
The cable routing for power cables and monitoring cables
meets the requirements for routing power cables and signal
cables and complies with the cable routing plan.
The power-on commissioning process requires at least two qualified electricians, one
responsible for operations and the other for monitoring.
Cautions and warnings must be properly placed onsite.
Users are categorized as admin and operator. Admin users have more rights than operator
users.
Powering off the PDC disconnects the power supply to the downstream devices. Exercise
caution with this operation when the PDC is supplying power to a working system.
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning Guide
Figure
6-1.
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No