Power-On Commissioning; Check Before Power-On Commissioning - Huawei PDU8000 User Manual

Modular integrated pdc v1.0
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Integrated PDC V1.0
User Manual

6.1 Check Before Power-On Commissioning

Table 6-1 Hardware installation checklist
No.
1
2
3
4
5
Table 6-2 Electrical connection checklist
No.
1
2
3
4
5
6
Issue 07 (2019-04-15)
6

Power-On Commissioning

Check Item
The cabinet is clean, without dust or sundries.
The paint on the cabinet exterior is intact.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The surrounding area of the cabinet contains no waste tape,
cable ties, paper, or packing materials.
Check Item
All cables are connected properly.
The ground cable is connected properly.
The excessive sections of ground cables and power cables
are cut off.
Phase cables are connected properly.
Power cables and ground cables are routed and bundled
separately from other types of cables.
All circuit breakers are OFF.
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
49

Advertisement

Table of Contents
loading

Table of Contents