Electrical installation
4.5 Connections
Signal cables
1. Route the signal cables into the cabinet from the bottom left.
2. Route the signal cables up through the cabinet to terminal blocks -X30, -X40 or -X50.
3. Attach the signal cables at suitable points.
4. Connect the signal cables to the terminal blocks.