Mechanical installation
3.2 Mechanical installation: Checklist
Table 3- 1
Mechanical installation: Checklist
Item
Activity
1
Check the transport indicators prior to installation.
(→ See Chapter "Installation/preparation", Section "Transport indicators")
2
Check the cabinet center of gravity shown on the label provided.
3
The ambient conditions must be permissible.
(→ See general technical data in Chapter "System overview", Section "System data")
4
The load-carrying capacity and properties of the ground must fulfill the requirements
for installation of the Cabinet Modules.
(→ See Chapter "Cabinet Modules" in the technical data for the relevant Cabinet Mod-
ules)
(→ See Chapter "Mechanical installation", Section "Preparation")
5
The crane transport assembly (option M90) installed for delivery must be removed
once the transport unit or individual cabinet units have been set down at the final in-
stallation location.
(→ See Chapter "Installation", Section "Disassembling the crane transport assembly")
6
Before the cabinet units are finally installed, the wooden pallets supplied with the
transport unit must be removed properly.
(→ See Chapter "Installation", Section "Lifting from the transport pallet and installing
the cabinet units")
7
The required minimum ceiling height must be observed. The cooling air supply and
discharge must not be obstructed and must provide an adequate quantity.
(→ See Chapter "Installation", Section "Preparation")
8
The cabinet must be firmly attached to the fixing points provided.
The cabinet units must be correctly connected with one another.
The collecting pipes of the cooling circuit must be connected.
(→ See Chapter "Installation", in Section "Mechanical connection of the cabinet units")
9
If it is possible to enter the area underneath the cabinet units, plant-side touch protec-
tion must be provided for this area.
10
With option M26, the installed cabinet equipment must be enclosed on the right, and
with option M27, the installed cabinet equipment must be enclosed on the left!
Side panel installed on the right (option M26)
Side panel installed on the left (option M27)
(→ See Chapter "Options", Section "M26 / M27, side panels mounted to the right or
left".)
11
All shock protection measures (guards, plates) in and on the cabinet units must be
installed before commissioning.
12
The clearance around an open control cabinet door (escape route) specified in the
applicable accident prevention guidelines must be observed.
46
Applicable?/Completed?
Cabinet Modules liquid cooled
Manual, 10/2015, A5E37067587A