Important Peak Cut Settings
2.1.2 Details of peak cut settings
2
38
Time zone to reduce the operation capacity
Large
Operation
capacity
Small
Peak cut must be set to 70% or 60%.
Peak cut
Compressor HZ
70 %
45 Hz less than max Hz
60 %
55 Hz less than max Hz
Capacity Performance Data with peak cut 70 % set point TA 46°C U-250PZH2E8/
PAW-VP1000LDHW
● Capacity U-250PZH2E8/PAW-VP1000LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 70 %/14 kW, heating up time 173 min
● Capacity U-10ME2E8/PAW-VP1000LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 70 %/16 kW, heating up time 144 min
● Capacity U-250PZH2E8/PAW-VP750LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 70 %/14 kW, heating up time 150 min
● Capacity U-10ME2E8/PAW-VP750LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 70 %/16 kW, heating up time 121 min
● Capacity U-100PZH2E8/PAW-VP500LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 70 %/7 kW, heating up time 126 min
● Capacity U-100PZH2E8/PAW-VP200LDHW at +7°C ambient temperature, heating water
from +10°C to 55°C
Capacity Performance Data with peak cut demand 60 %/5 kW, heating up time 133 min
Heating up time SCOP
173
3.9
208
4.1