Initial Adjustment; Parameter Confirmation - Mitsubishi Electric MDS-B-SPJ2 Series Specification Manual

Ac spindle drive unit
Table of Contents

Advertisement

8.2 Initial adjustment

8.2.1 Parameter confirmation

After installation is finished and the wiring, etc., has been checked, confirm the spindle parameters
again.
∗ Confirm that the spindle NC, spindle specifications and spindle adjustment parameters match the
machine specifications and spindle system specifications.
The SPINDLE PARAMETER screen appears when the NC menu key
The spindle parameters are divided into those controlled on the NC side and those controlled on the
spindle controller side.
(Note 1) Refer to the instruction manual for each CNC for details on operation methods and NC
side parameters.
(Note 2) Each parameter screen is shown as a 14-inch CRT screen.
(1) SPINDLE NC PARAMETER
[SP-NC PARAM]
DATA
SPINDLE
CONSTANT
8. Adjustment Procedure
TIMER
COUNTER BIT-SELECT
8 − 3
SPINDLE
M-PARAM 9. 1/30
PLC-AX
PSW
is pressed.
MENU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents