3.4 Checking the nitrogen pressure

Context
Procedure
Step 1 Open the door lock using a key, and open the cabinet rear door.
Step 2 Unfasten the rotating baffle plates, and remove the air filters.
Issue 03 (2020-08-30)
The device has been injected with 0.2–0.6 MPa nitrogen before delivery. Check
the nitrogen pressure for nitrogen leakage.
You can open or close the exhaust valve using a flat-head screwdriver.