ABB ACS560 Quick Installation And Start-Up Manual page 16

Hide thumbs Also See for ACS560:
Table of Contents

Advertisement

84 Electrical installation
84 Electrical installation
16 EN - Quick installation and start-up guide
5. Connect the input power cable as follows:
5. Connect the input power cable as follows:
Ground the shield 360 degrees by tightening the clamp of the power cable
Ground the shield 360 degrees by tightening the clamp of the power cable grounding
Ground the shield 360 degrees by tightening the clamp of the power cable
grounding shelf onto the stripped part of the cable (6a).
shelf onto the stripped part of the cable (6a).
grounding shelf onto the stripped part of the cable (6a).
Connect the twisted shield of the cable to the grounding terminal (6b).
Connect the twisted shield of the cable to the grounding terminal (6b).
Connect the twisted shield of the cable to the grounding terminal (6b).
Connect the phase conductors of the cable to the terminals of L1, L2 and L3.
Connect the phase conductors of the cable to the terminals of L1, L2 and L3.
Connect the phase conductors of the cable to the terminals of L1, L2 and L3.
Tighten the screws to the torque given below.
Tighten the screws to the torque given below.
Tighten the screws to the torque given below.
Frame size
Frame size
Frame size
L1. L2. L3
L1. L2. L3
L1, L2, L3
EN
6c
6c
HI
6b
6b
6a
6a
6. For R3, connect cable by the motor cable method mentioned instep 3.
6. For R3, connect cable by the motor cable method mentioned instep 3.
6. Connect cable by the motor cable method mentioned in step 3.
7. Ground the shield 360 degrees (7a).
7. Ground the shield 360 degrees (7a).
7. Ground the shield 360 degrees (7a).
8. Connect the twisted shield to the grounding terminal (7b).
8. Connect the twisted shield to the grounding terminal (7b).
8. Connect the twisted shield to the grounding terminal (7b).
9. For R3, connect the conductors to the R+ and R- terminals (7c).
9. Connect the conductors to the R+ and R- terminals (7c).
9. Connect the conductors to the R+ and R- terminals (7c).
10. Tighten to the torque given below.
10. Tighten to the torque given below.
10. Tighten to the torque given below.
Frame size
Frame size
Frame size
R+. R-
R+. R-
R+, R-
Finalization
11. Install the grounding shelf for the control cables (included with the mounting screws in
a plastic bag in the delivery) onto the grounding shelf for the power cables.
R3
R3
N·m
lbf·ft
N·m
lbf·ft
N·m
2.5...4.5 1.8...3.3
2.5...4.5 1.8...3.3
2.5...4.5
R3
R3
N·m
lbf·ft
N·m
lbf·ft
2.5...4.5 1.8...3.3
2.5...4.5 1.8...3.3
2.5...4.5
7c
7c
7b
7b
7a
7a
R4
R3
R4
N·m
lbf·ft
N·m
lbf·ft
lbf·ft
N·m
4.0
3.0
4.0
3.0
1.8...3.3
4.0
R3
N.m
R4
lbf·ft
3.0
lbf.ft
1.8...3.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents