UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Step 5 Install the removed side panel on the side of the top air-flow cabinet.
Step 6 Install the side and front anchor baffle plates.
Figure 6-86 Installing anchor baffle plates
----End
Issue 05 (2021-10-13)
Figure 6-85 Tightening the anchor bolts
d.
Reinstall the power distribution cover and bottom cover.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
136