UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
●
6.3.5.1 Installing Cabinets
Install cabinets by referring to Single UPS Installation (1200 kVA, Three-Phase
Four-Wire) > Installation in Top Air-Flow Configuration > Installing Cabinets.
6.3.5.2 Installing Copper Bars and Cables
1.
2.
3.
4.
Issue 05 (2021-10-13)
The following procedure applies to installation against a wall. If cabinets are
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and
the anchor screws at the bottom.
Install copper bars and cables by referring to Single UPS Installation (1200
kVA, Three-Phase Four-Wire) > Installation in Top Cabling Configuration
> Installing Copper Bars and Cables.
Install fan power cables by referring to Single UPS Installation (1200 kVA,
Three-Phase Four-Wire) > Installation in Top Air-Flow Configuration >
Installing Cables.
Install the top frame for the top air-flow cabinet.
Figure 6-90 Installing a top frame
Install the mounting plates for the top air-flow cabinet.
Figure 6-91 Installing mounting plates
Copyright © Huawei Technologies Co., Ltd.
6 Installation
139