UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-206 Installing signal cables inside the cabinets
Step 3 Install equipotential ground cable for cabinets.
Figure 6-207 Installing equipotential ground cables
Step 4 (Optional) Remove the copper bars between the mains input and bypass input.
● Perform this step only when the mains input and bypass input use different
● The mains and bypass copper bars are heavy. To prevent personal injury or
Issue 05 (2021-10-13)
NO TICE
power sources.
device damage, arrange for two persons to work together.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
206