Installation Flowchart; Unpacking The Equipment - Huawei AP4050DN Hardware Installation And Maintenance Manual

Table of Contents

Advertisement

AP4050DN-HD
Hardware Installation and Maintenance Guide

2.2 Installation Flowchart

The following figure shows the process for installing an AP.
Figure 2-1 Installation flowchart

2.3 Unpacking the Equipment

Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing list contains the following items.
Issue 01 (2016-04-15)
AP device
Indoor fixed sheet metal mounting bracket
DC power adapter (optional)
Screw
Adjustable buckle
Hose clamp (optional)
Expansion screws
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 AP Installation
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap4050dn-hd

Table of Contents