Backing Up The Project; Transmission From The Execution Memory Ram To The Backup Memory Rom2 - Panasonic FP7 Series User Manual

Cpu unit
Hide thumbs Also See for FP7 Series:
Table of Contents

Advertisement

5.3 Backing Up the Project

5.3.1 Transmission from the Execution Memory RAM to the Backup Memory
ROM2
● In normal operation, you can save your project in the execution memory RAM/ROM1, and
use the saved data. In order to prepare for unplanned rewriting, backup memory ROM2 is
also installed.
● When the mode switch is set to PROG., you can back up the execution project that is saved
in RAM into ROM2.
Switch setting conditions
Mode switch
Card operation switch
1.
Set the mode switch to PROG.
2.
By executing Online>Project Backup using FPWIN GR7, the project is transmitted from
the execution memory RAM to the backup memory ROM2.
WUME-FP7CPUH-09
Switch

5.3 Backing Up the Project

Setting
PROG.
ROM
5-7

Advertisement

Table of Contents
loading

Table of Contents