5.3 Backing Up the Project
5.3.2 Transmission from the Backup Memory ROM2 to the Execution Memory
RAM/ROM1
It is possible to transmit the backup project saved in ROM2 to RAM/ROM1 to be used as an
execution project.
Switch setting conditions
Mode switch
Card operation switch
1.
Set the mode switch to PROG.
2.
By executing Online>Project Restore using FPWIN GR7, the project is transmitted from
the backup memory ROM2 to the execution memory RAM.
3.
The project data is also automatically transmitted from RAM to ROM1.

5.3.3 Operations following Powering On/Off

Powering the unit on or off does not affect data saved in the backup memory ROM2.