NEC Express5800 Series User Manual page 86

Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

Chapter 2 Preparations
(a)
Using internal simple UPS
Jumper on the motherboard (BBU MODEL)
(b)
Not using internal simple UPS
Jumper on the motherboard (BBU MODEL)
5.
Reassemble the server.
6.
Power on the server.
The message to suggest off/on of AC power in POST is indicated because HWID isn't identical, so
put it into effect by the next procedure.
(1) Push the power switch of the server and the power supply of the server is turned off.
(2) Remove power cord of the server.
(3) Connect the power cord to the server after you wait for more than 30 seconds.
(4) Push the power switch and the power supply is turned on, and you confirm that a message isn't
indicated again.
7.
Configure operation settings of the internal battery as needed.
You can configure the internal battery by BMC Management Console, NEC ESMPRO Manager, or
Server Configuration Utility.
For details, see the online help stored in BMC Management Console and NEC ESMPRO Manager,
see Chapter 2 (2.4 Battery Configuration) in the "Maintenance Guide" about Server Configuration
Utility.
86
Motherboard
Express5800/T110j-S, T110j-S (2nd-Gen) User's Guide
1. Installing Internal Optional Devices
BBU MODEL
3 2 1
Enabled
Enabled: Set to 2-3
Disabled: Set to 1-2
3 2 1
Disabled

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/t110j-sExpress5800/t110j-s 2nd-genExp338Exp338a

Table of Contents