Phase-To-Phase Faults - Hitachi RED670 Commissioning Manual

Hide thumbs Also See for RED670:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
The programming of the autorecloser function SMBRREC determines if three-phase or single-phase
trip is initiated as result of the test.
Keep the current constant when measuring operating characteristics. Keep the current as close as
possible to its rated value or lower. But make sure it is higher than the set minimum operating
current.
Ensure that the maximum continuous current in an IED does not exceed four times its rated value, if
the measurement of the operating characteristics runs under constant voltage conditions.
To verify the mho characteristic, at least two points should be tested.
In the following, three test points are proposed. The mho characteristic always goes through the
origin, which automatically gives a fourth point for the characteristic.
11.4.3.1

Phase-to-phase faults

IEC07000009 V4 EN-US
Figure 27:
Table 25:
Test
points
1
2
3
Change the magnitude and angle of phase-to-phase voltage to achieve impedances at test points 1,
2 and 3. For each test point, observe that the output signals, START, STLx and STPP are activated
where x refers to the actual phase to be tested. After the timer tPP for the actual zone has elapsed,
also the signals TRIP, TRPP and TRx shall be activated.
106
X
3
50%
ZAngPP
Proposed test points for phase-to-phase fault
Test points for phase-to-phase (ohms / phase)
reach
Value
X
ZPP · sin(ZAngPP)
R
ZPP · sin(ZAngPP)
X
0,5· (ZPP· sin(ZAngPP)
R
0,5·ZPP + ΔR = 0,5·ZPP·(1+cos(ZAngPP))
X
0,5·ZPP·sin(ZAngPP)
R
0,5·ZPP - ΔR = 0,5·ZPP(1-cos(ZAngPP))
© 2017 - 2022 Hitachi Energy. All rights reserved
1
ZPP
2
R
Ohm/phase
IEC07000009-4-en.vsd
1MRK 505 378-UEN Rev. K
Comments
Line differential protection RED670
Commissioning manual
M14944-292 v8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents