Hitachi RED670 Commissioning Manual page 82

Hide thumbs Also See for RED670:
Table of Contents

Advertisement

Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
IEC140000143 V1 EN-US
Figure 15:
Open the capture file and observe the captured synchrophasor data. In order to get the Phasor
names on top of each column (See figure 16), the capture process should start before
connecting the PMU Connection Tester to the PMU, i.e. first start the capturing and then click
Connect.
76
Stop capturing the IEEE C37.118 synchrophasor data
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 378-UEN Rev. K
IEC140000143-1-en.vsd
Line differential protection RED670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents