Completing The Test; Autorecloser For 1/2/3-Phase Operation Smbrrec - Hitachi RED670 Commissioning Manual

Hide thumbs Also See for RED670:
Table of Contents

Advertisement

1MRK 505 378-UEN Rev. K
WA1_QA1
(SESRSYN 1)
LINE1_QB9
IEC11000274 V3 EN-US
Figure 53:
11.10.1.5

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
11.10.2

Autorecloser for 1/2/3-phase operation SMBRREC

Verification of the auto recloser for single-phase, two-phase or three-phase auto reclosing attempts
can be considered to consist of two parts.
One part to verify the internal logic and timing of the auto recloser
One part to verify its interaction with the protection system
This section deals with verification of the auto recloser itself. However, it is practical to start the auto
recloser by activating a protection function, for example, by secondary injection tests.
Prepare the IED for verification of settings outlined in Section
The purpose of verification before commissioning is to check that entered selections, setting and
configuration render the intended result. The auto recloser is flexible with many options and facilities.
At commissioning only the selections and settings intended for use are verified. If one chooses to
reduce some time settings in order to speed up verification, be careful to set the auto recloser at
intended operational values at the end of the verification procedure. One such parameter is the
tReclaim time that must be timed out before a new test sequence can be performed.
The verification test is performed together with protection and trip functions.
Figure
54
an external bi-stable relay (BR), for example a relay type RXMVB2 or RXMD or Breaker Simulator of
Hitachi Power grids. The following manual switches are used:
Line differential protection RED670
Commissioning manual
TIE_QA1
(SESRSYN 2)
LINE1
Objects used in the voltage selection logic
illustrates a suggested testing arrangement, where the circuit-breaker (CB) is simulated by
© 2017 - 2022 Hitachi Energy. All rights reserved
WA1
WA2
WA2_QA1
(SESRSYN 3)
LINE2_QB9
LINE2
IEC11000274-3-en.vsd
"Preparing the IED to verify
Section 11
Testing functionality by secondary injection
settings".
M2377-1042 v5
M12400-2 v12
211

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents