Section 11
Testing functionality by secondary injection
IEC07000188 V1 EN-US
Figure 57:
11.17

Basic IED functions

11.17.1

Parameter setting group handling SETGRPS

Prepare the IED for verification of settings as outlined in section
11.17.1.1

Verifying the settings

1.
Check the configuration of binary inputs that control the selection of the active setting group.
2.
Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test /Function status/
Setting groups /ActiveGroup
The ActiveGroup menu is located on the PCM600 under Main menu/Test/Function status/
Setting groups /ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and observe
the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups are
described in the corresponding PCM600 documents and instructions for the operators within
the SCS are included in the SCS documentation.
11.17.1.2

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
252
Test of RTC with I/O
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 378-UEN Rev. K
"Preparing for test"
in this chapter.
Line differential protection RED670
Commissioning manual
SEMOD52026-1 v1
M11369-2 v4
M11369-4 v5