Completing The Test; Direct Transfer Trip Logic; Low Active Power And Power Factor Local Criteria Lappgapc - Hitachi RED670 Commissioning Manual

Hide thumbs Also See for RED670:
Table of Contents

Advertisement

1MRK 505 378-UEN Rev. K
10.
Inject the polarizing voltage 3U0 to about 110% of the setting ( 3U0> ) and adjust the phase
angle between the voltage and current to (180°- AnglRCA) setting, the current leads the
voltage.
11.
Inject current in one phase to about 110% of the set operate current (IN>Dir ).
12.
Activate the CRL binary input.
13.
Abruptly reverse the current to 65° lagging the voltage to operate the forward directional
element.
14.
Switch the current off and check that the ECHO, CS and TRWEI appear on the corresponding
binary output during 200ms after resetting the directional element. If EF4PTOC also operates in
forward direction, CS should be obtained.
15.
Switch the polarizing voltage off and reset the CRL binary input.
11.11.6.3

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
11.11.7

Direct transfer trip logic

11.11.7.1

Low active power and power factor local criteria LAPPGAPC

Prepare the IED for verification of settings as outlined in section
"Preparing for test"
1.
Connect the test set for three-phase current injection and three-phase voltage to the
appropriate IED terminals.
2.
Inject symmetrical phase voltages equal to the rated voltage.
3.
Decrease the injected current in phase L1 and note the operated value (start value) of the
studied step of the function. This current shall have the same phase angle as the injected
phase voltage. The active power for operation is calculated as:
active power).
4.
Increase the current slowly and note the reset value.
5.
Connect a trip output contact to a timer.
6.
Set the injected current to 50% of the operate level in the tested stage. Switch on the current
and check the time delay.
7.
Check that all trip and start contacts operate according to the configuration (signal matrices).
8.
Finally check that start and trip information is stored in the event memory. Repeat steps 3 – 6
for phases L2 and L3.
9.
Inject symmetrical phase voltages and phase currents in all three phases, equal to SBase
(rated voltage and current).
10.
Increase the phase angle between the injected phase voltages and phase current, and note the
operate value φ. The corresponding power factor is equal to
11.
Decrease the phase angle and note the reset value.
Line differential protection RED670
Commissioning manual
No ECHO and TRWEI should appear.
No ECHO and TRWEI should appear.
in this chapter.
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
GUID-F6AE5927-D93F-4CAD-A6C6-445720C806D8 v1
GUID-5F73C74C-3BA1-4DF0-8D04-CE1416AF727D v1
"Requirements"
and section
=
×
P
U
I
(single-phase
ph
ph
j
=
pf
cos
.
Section 11
M13936-90 v5